With gearbox finally attached, and most of the ancillaries in place, the engine and gearbox went back in on Monday.
Next jobs on the list:
- Refit tailshaft, PPF and shifter
- Bleed clutch system (has a new flexible line to replace the squiggly hardline)
- Make and fit fuel lines for to and from the fuel rail to the FPR and return line.
- fit radiator and finalise reroute piping
- fit intercooler and fabricate intercooler pipework
- Extend IAT sensor wiring to the new IAT location (exit of intercooler)
- Mount ignition coils
- Mount oil filter block and make lines
- mount oil cooler and make lines
So many jobs left to do!