However, April did see the fixed section of the airbox completed.
This is the air box outer shell.



The panel filter flange plate that attaches to the airbox shell was milled from a piece of 30mm think aluminium billet.

The inside profile is a negative of the panel filters urethane flange.

For the airbox to attach to the throttle body flange some minor modifications to the engine body were required....just a bit of die-grinding here and there.




With the inlet manifold removed it really highlights how low the engine is positioned in the chassis. It's just below the top flange of the chassis rails.



Time to assemble the fixed section of airbox.

.....and ta-da!! The shell was glued (Sikaflex) and attached with drive pins.




It was also a good opportunity to drill and tap the throttle body flange plate for the air temperture and air pressure sensors.


....and back on the engine.




With and without the panel filter.


The crankcase breather was also remade to give more clearance to the underside of the airbox.

Other work that was completed was the installation of the ECU, PDM and ignition module assembly....


...and the design of the battery mounting bracket.


Hopefully the month of May is more productive.

Cheers,
Danny